IEC 62305-2:2024, AS 1768:2021 & NFPA 780-2026

Lightning risk assessment, traceable clause by clause

Pick the standard your project follows and model the structure once. The engine computes every risk component under that standard, shows the working behind each figure, and issues a report your firm signs.

30 min
From a blank building to a signed report
3
Standards: IEC 62305-2, AS 1768 & NFPA 780

Lumex™ runs IEC 62305-2:2024, AS 1768:2021 & NFPA 780-2026, so the number you sign is the one the standard gives.

What Lumex™ does

A laptop showing a 3D building model on an engineer's desk, beside rolled drawings, a hard hat and a scale model, with a city skyline behind
Compute

Automated risk calculation

Sphera runs IEC 62305-2:2024, AS 1768:2021 and NFPA 780-2026, each by its own method. It reproduces the IEC Annex F examples and matches the Standards Australia AS 1768 tool, apart from two values where it follows the standard's own text.

Prove

Traceable calculations

Every result carries a full trace to the clause, equation or table of the standard you chose, so you can defend each figure for clients or auditors.

Deliver

Client-ready protection reports

Generate a client-ready report in minutes that cites IEC 62305-2, AS 1768 or NFPA 780 throughout. Every PDF carries your logo and firm name, and on Enterprise your colours and wording too.

Trust

Audit-ready compliance log

Every edit and approval is saved to an append-only audit log, so each assessment keeps a defensible compliance trail, whichever standard it follows.


National rules for IEC 62305-2

Your regulator's numbers, not just the IEC defaults

IEC 62305-2 clause 7.3 gives 10⁻⁵ per year as a representative tolerable risk, not a fixed one. Your authority can set its own RT and FT, and Lumex™ treats those as data you select.

Select

Pick the rules before the calculation

Choose the jurisdiction before anything is computed, so the verdict belongs to the authority that reads it. Each departure from the IEC defaults shows its clause.

Apply

A national tolerable risk carries through

Where your regulator sets its own RT or FT, that value replaces the IEC default everywhere, including the protection Lumex™ recommends.

Depart

Real departures, already modelled

The standard lists national practices in its own foreword. Germany fixes rp = 1. Italy judges RL1 and RL2 separately. The Netherlands and South Africa leave out Annexes D and E.

Prove

The report says which rules ran

Your report prints the jurisdiction, every departure applied and the citation for each. Any reviewer can tell a regulator's rule from a software error.

Why teams move over

One stray formula away from a wrong number

A DIY Excel model and a rebranded Word template break right when it matters most, and nobody recalls who changed what. Lumex™ runs the whole assessment in one place.

Excel and Word

The Excel and Word way of running an assessment A spreadsheet with a stray formula, sheet tabs with one standard missing, crossed-out tries, a Word template being re-skinned, a file emailed back and forth, a site photo with notes, and a calendar sticky note. fx IEC AS NFPA 1 2 3 4 5 6 7 8
  1. A guided assessment, start to finish: A blank sheet
  2. The standard you work to: One sheet per standard, if anyone built it
  3. The lightning risk from the standard's coefficients: Typed by hand, quick to break
  4. Protection that brings the risk within limits: Trial and error
  5. Review and sign-off before issue: Files emailed back and forth
  6. Site data from the field: Notes and photos retyped later
  7. A client-ready deliverable: Re-skinned by hand each time
  8. Reassessment when it falls due: A calendar note, if anyone sets one

Lumex™

  1. A guided assessment, start to finish

    Guided steps for each standard, from structure to verdict

  2. The standard you work to

    IEC 62305-2:2024, AS 1768:2021 and NFPA 780-2026 built in

  3. The lightning risk from the standard's coefficients

    A live engine that recomputes as you type

  4. Protection that brings the risk within limits

    The smallest set of measures, recommended for you

  5. Review and sign-off before issue

    Reviewer approval and engineer sign-off built in

  6. Site data from the field

    Phone capture in the browser today, the Surveyor app coming soon

  7. A client-ready deliverable

    A standard-cited PDF, emailed to the owner from Lumex™

  8. Reassessment when it falls due

    Email reminders a month ahead and on the day

How it works

Purpose-built for lightning standards, from the first input

Go from a blank project to a client-ready report in four guided moves, all in the browser, with no install and nothing to rebuild at the end.

  1. Step 1: Describe the structure and its zones

    Capture the geometry, surroundings and protection, then split the structure into risk zones, each with its own inputs.

  2. Step 2: Work the standard's guided flow

    Guided steps for IEC 62305-2, AS 1768 or NFPA 780 resolve the risk against the tolerable limit, showing the working behind each figure.

  3. Step 3: Review every figure and sign off

    The author checks every figure and signs off, a reviewer approves it, and each action is saved to the audit log.

  4. Step 4: Issue and share the client-ready report

    Export the full or short PDF report, or send the building owner a secure link straight from Lumex™, ready to file.

One assessment from structure to issued reportA drawing sheet. Pin 1 marks a building split into zone 1 and zone 2. Pin 2 marks the standards IEC 62305-2, AS 1768 and NFPA 780 beside a risk bar, the tolerable limit and the working. Pin 3 marks the title block: author signed off, reviewer approved, and the audit log. Pin 4 marks the outputs: full PDF, short PDF, and a secure link to the building owner.HZone 1Zone 2IEC 62305-2AS 1768NFPA 780Tolerable limitRiskWorkingAuthorSigned offReviewerApprovedAudit logFull PDFShort PDFSecure linkBuilding owner1234

See each step in detail on how it works.


Lumi, the AI assistant

AI that explains every figure and never invents one

Lumi works inside your assessments and answers from their own calculation trace. Sphera computes every figure, and the signing engineer makes every call.

Review

Draft review

Before you compute, Lumi reads the draft and flags inputs that look wrong or are missing, so you can fix them first.

Explain

Every figure explained

Ask how any figure was worked out, or what drives a risk. Lumi answers from the assessment's own calculation trace.

Explore

What-if reruns

Rerun an assessment with different building dimensions and see how the result moves before you commit to a design.

Protect

The least protection that passes

Lumi finds the smallest set of measures that brings each risk within its limit, by the standard's own method.

Report

Report narrative drafted

Lumi drafts the narrative from the computed figures and your notes. You edit and approve it before anything is issued.

Ask

Your workspace, answered

List and count your projects, clients and assessments, or get a saved result summarised in plain words.

The engineer stays in control. Lumi explains, suggests and drafts. It never changes a computed figure.

LumiAnswered from Tower A

YouWhat if the tower is 30 m, not 42 m?

Reading Sphera's figures

I reran it as a draft. At 30 m, risk R is lower but still above RT. Your saved result is unchanged.

Draft rerunFigures from Sphera

YouWhat is the least protection that passes?

Testing measures with Sphera

Two measures bring every risk within its limit: LPS class III, and coordinated SPDs at the service entrance.

R within RTFigures from Sphera

YouDraft the summary for the report

Drafting from the computed figures

Risk summary Draft

Tower A needs protection. With an LPS of class III and coordinated SPDs, every risk falls within its tolerable limit.

You edit and approve it before anything is issued.

Tower A, the what-if rerun and the protection Lumi found A line drawing of Tower A, 42 m tall, with a dashed line at 30 m for the what-if rerun. An air terminal on the roof and a down conductor to earth, and surge protection at the service entrance. Beside it, three risk columns against the dashed line of the tolerable risk, all from Sphera: the saved 42 m result is above the limit, the 30 m draft rerun is lower but still above, and with LPS class III and coordinated SPDs the risk is within the limit. 42 m 30 m Risk R, from Sphera RT 42 msaved 30 mdraft LPS IIIand SPDs

Lumi uses AI and can make mistakes. Check important answers.

A real engine, not a lookup table

Sphera, straight from the standard

Lumex™ recomputes your lightning risk against the tolerable limit as you describe the structure, so every figure traces back to the standard you chose with no spreadsheet to maintain.

See the platform
Who it's for

For the people who put their name on it

01

Electrical consultants

Learn more
02

MEP & design firms

Learn more
03

LPS installers & auditors

Learn more

Get started today

Guided from structure to verdict, where Excel hands you a blank sheet